The installation process

Five steps. Most of the work happens before the coating.

Why we grind, repair, and clean every slab first — and what that means for how long the floor lasts.

Worker cutting into concrete with a diamond blade
Mechanical preparation comes before any coating.
Installers spreading coating across a warehouse slab

Five steps

Most of the work happens in the first three.

The finish is what you see on day one. How long it stays that way is decided earlier — by the inspection, the preparation, and the repairs underneath it.

  1. 01

    Inspect

    We look at the slab before quoting a system: previous coatings or sealers, cracks and spalling, oil and other contamination, signs of moisture, and how the space is actually used.

  2. 02

    Prepare

    The concrete is mechanically prepared — typically with diamond grinding — to remove the weak top layer and open the surface to the profile the coating needs to bond.

  3. 03

    Repair

    Cracks, pits, and surface defects are filled and ground flush where needed, so they do not show through or become the first place the floor fails.

  4. 04

    Coat

    The selected system goes down in layers: base coat, then the decorative build — flake broadcast, metallic pour, or solid color — at the right thickness for the space.

  5. 05

    Finish

    A protective topcoat suited to the traffic and finish goes on last. We walk the floor with you, go over cure times for foot traffic and vehicles, and explain care.

Crew rolling a coating across a large concrete floor

Why preparation matters

A great floor starts before the coating goes down.

An attractive finish means very little if the coating is not properly bonded to the concrete.

Peeling, hot-tire lifting, and bubbling are almost always preparation problems, not product problems. A coating applied over a washed or etched slab sits on top of dust, old sealer, and weak surface paste. When that layer lets go, the coating goes with it.

This is the difference between an Everfield floor and a weekend kit — or a contractor who rolls a coating over concrete that was never ground.

Mechanical preparation
Grinding removes laitance, old sealers, and the weak top layer instead of just washing or etching it.
Surface profiling
The concrete is opened to a texture the coating can grip — not polished smooth, not left rough.
Crack repair
Cracks and pits are filled and ground flush so they do not print through the finish.
Contaminant removal
Oil, tire residue, and paint are removed, not sealed in under the new coating.
Coating selection
The system is matched to the slab, the climate, and how the floor will be used.
Professional application
Products are mixed, timed, and applied to the manufacturer’s requirements, at the right thickness.
Protective topcoat
The final layer takes the wear, so the decorative coat underneath keeps its look.
How a typical quick install compares with Everfield’s approach
StageMany DIY kits & quick installsHow Everfield installs
Surface prepPressure wash or acid etchDiamond grinding to open the surface
Cracks & defectsCoated over as-isFilled and ground flush first
Coating buildOne thin roll-on coatLayered system built for the space
TopcoatOften skippedProtective topcoat matched to use

Ready to finish the floor?

Tell us about your space and the finish you’re considering. We’ll help determine the right coating system for the project.